Høga Kusten Bron
Project
Manager for HMV’s supply of Aerial Spinning equipment and Cable Compactors.
Lead for the design team, manufacturing and work shop testing. Commissioning
and supervising operation of the equipment.
Spinning was done according to the Free Hanging principle for the last time. Storebelt was done in parallel according to the Controlled tension method and produced 20.000 tons of cable while Høga Kusten produced 6.800 tons.
Employed by Hordaland Mek. Verkstad.
Spinning was done according to the Free Hanging principle for the last time. Storebelt was done in parallel according to the Controlled tension method and produced 20.000 tons of cable while Høga Kusten produced 6.800 tons.
Employed by Hordaland Mek. Verkstad.